Catalogue / Civil & foundation works

No photo yet

Site roads, drainage and boundary wall, Smart 8 seriesSample

by Hoysala Logistics (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Hoysala Logistics (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Site roads, drainage and boundary wall from Hoysala, Smart 8 series: 3 works volume options between 1 MW equivalent and 10 MW equivalent. Design: local labour employed where possible, monsoon-ready drainage planning and daily quantity and progress log. Used by industrial plants, solar parks and substations and control rooms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Hoysala
Model
HOY-5E1 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
4-12 weeks execution
Warranty
Pile load test certified
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume1 MW equivalentHOY-5E1-01Works volume: 1 MW equivalent1 job · 4-12 weeks executionon quote
Works volume5 MW equivalentHOY-5E1-02Works volume: 5 MW equivalent1 job · 4-12 weeks executionon quote
Works volume10 MW equivalentHOY-5E1-03Works volume: 10 MW equivalent1 job · 4-12 weeks executionon quote

Specifications

Works volume1 MW equivalent to 10 MW equivalent (see variants)
Foundation typeRaft or isolated footingmade to order: Driven steel pile / Ramming or screw pile / RCC bored pile
Concrete gradeM25
Pull-out testing2% piles testedmade to order: Random test plus lateral load
ReinforcementFe 500D TMTmade to order: Fe 550D
Roads and drainageNot included
BoundaryChain link fence 2.4 m
QualityCube test reports per pour
MachineryBatching plant at site
Duration3-6 months
Payment termsMeasured running bills

BARREL: Bharat Atom Renewable Resources Energy Limited