Catalogue / Civil & foundation works
Site roads, drainage and boundary wall, Smart 8 seriesSample
by Hoysala Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Hoysala Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Site roads, drainage and boundary wall from Hoysala, Smart 8 series: 3 works volume options between 1 MW equivalent and 10 MW equivalent. Design: local labour employed where possible, monsoon-ready drainage planning and daily quantity and progress log. Used by industrial plants, solar parks and substations and control rooms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Hoysala
- Model
- HOY-5E1 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 4-12 weeks execution
- Warranty
- Pile load test certified
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume1 MW equivalentHOY-5E1-01 | Works volume: 1 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume5 MW equivalentHOY-5E1-02 | Works volume: 5 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume10 MW equivalentHOY-5E1-03 | Works volume: 10 MW equivalent | 1 job · 4-12 weeks execution | on quote |
Specifications
| Works volume | 1 MW equivalent to 10 MW equivalent (see variants) |
|---|---|
| Foundation type | Raft or isolated footingmade to order: Driven steel pile / Ramming or screw pile / RCC bored pile |
| Concrete grade | M25 |
| Pull-out testing | 2% piles testedmade to order: Random test plus lateral load |
| Reinforcement | Fe 500D TMTmade to order: Fe 550D |
| Roads and drainage | Not included |
| Boundary | Chain link fence 2.4 m |
| Quality | Cube test reports per pour |
| Machinery | Batching plant at site |
| Duration | 3-6 months |
| Payment terms | Measured running bills |