Catalogue / Substation automation (IEC 61850)

No photo yet

IEC 61850 substation automation system, Core 3 seriesSample

by Hoysala Power Controls (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Hoysala Power Controls (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Core 3 range of IEC 61850 substation automation system by Hoysala covers 5 bays options (Up to 8 bays to Up to 128 bays). Highlights: cyber-secure remote access, redundant network with zero-recovery time and sequence of events recorder. Suited to industrial plants, transmission substations and metro traction. Designed and tested to IEC 61850, IEC 62351 and IEC 60870-5-104. Lead time 16-24 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Hoysala
Model
HOY-A52 series
Listing type
Product
Unit
lot
Minimum order
10 lot
Lead time
16-24 weeks
Warranty
36 months
Standards
IEC 61850, IEC 62351, IEC 60870-5-104
Delivers to
North India
GST rate
18 %
Country of origin
India
Packaging
Drum / reel with end caps
Delivery terms
FOR nearest railhead
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
BaysUp to 8 baysHOY-A52-01Bays: Up to 8 bays10 lot · 16-24 weeksfor verified buyers
BaysUp to 16 baysHOY-A52-02Bays: Up to 16 bays10 lot · 16-24 weeksfor verified buyers
BaysUp to 32 baysHOY-A52-03Bays: Up to 32 bays10 lot · 16-24 weeksfor verified buyers
BaysUp to 64 baysHOY-A52-04Bays: Up to 64 bays10 lot · 16-24 weeksfor verified buyers
BaysUp to 128 baysHOY-A52-05Bays: Up to 128 bays10 lot · 16-24 weeksfor verified buyers

Specifications

BaysUp to 8 bays to Up to 128 bays (see variants)
ArchitectureStation busmade to order: Station + process bus
ProtocolIEC 61850 Ed 2made to order: IEC 60870-5-104 / DNP3
Network topologyPRP
HMISingle HMImade to order: Redundant servers
Time syncSNTP
GatewayRedundant to RLDC / SLDC
Cyber-securityFirewall, IEC 62351, NERC style
HistorianIncluded, 5 years data
Engineering toolConfiguration software
Network switchesIndustrial managed
Auxiliary supply220 V DCmade to order: 110 V DC
TestingFAT + SAT

BARREL: Bharat Atom Renewable Resources Energy Limited