Catalogue / Waste-to-energy (incineration, RDF)

No photo yet

RDF-fired boiler and turbine plant, Flex seriesSample

by Indraprastha Bio Energy (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Indraprastha Bio Energy (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Indraprastha Flex RDF-fired boiler and turbine plant, offered in 5 plant capacity options from 100 TPD to 1000 TPD. Highlights: continuous emission monitoring linked to CPCB, automated crane and grate control and bottom ash used in brick or road base. Suited to urban local bodies, industrial waste processors and municipal corporations. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 18-24 months; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Indraprastha
Model
IND-267 series
Listing type
Product
Unit
lot
Minimum order
2 lot
Lead time
18-24 months
Warranty
24 months
Standards
SWM Rules 2016, CPCB emission norms, IBR 1950
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Packaging
Steel skid with shrink wrap
Delivery terms
Door delivery in metro cities
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity100 TPDIND-267-01Plant capacity: 100 TPD2 lot · 18-24 monthson quote
Plant capacity300 TPDIND-267-02Plant capacity: 300 TPD2 lot · 18-24 monthson quote
Plant capacity500 TPDIND-267-03Plant capacity: 500 TPD2 lot · 18-24 monthson quote
Plant capacity750 TPDIND-267-04Plant capacity: 750 TPD2 lot · 24-30 monthson quote
Plant capacity1000 TPDIND-267-05Plant capacity: 1000 TPD2 lot · 24-30 monthson quote

Specifications

Plant capacity100 TPD to 1000 TPD (see variants)
TechnologyGasificationmade to order: Moving grate / Fluidised bed
FuelIndustrial wastemade to order: MSW / RDF
Calorific value3200 kcal/kg
Steam parameters42 bar / 400 Cmade to order: 67 bar / 485 C
Power output3 MW
Flue gas cleaningSNCR, lime, bag filter, activated carbon
Residence time> 2 s at 850 C
Ash handlingWet bottom ash extractor
Dioxin controlActivated carbon injection
MonitoringCEMS online to CPCB
Design life25 years

BARREL: Bharat Atom Renewable Resources Energy Limited