Catalogue / Power system studies (load flow, short circuit, grid code)
Grid code compliance study, Ultra seriesSample
by Indraprasthajyoti Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Indraprasthajyoti Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Ultra service of grid code compliance study by Indraprasthajyoti covers 3 network scale options (33 kV plant to 132 kV system). Design: relay setting files ready to load, fault level verification of switchgear and reports for GNA/connectivity application. Used by BESS integrators, utilities and consultants and renewable developers seeking connectivity. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation Kick-off in 1 week; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Indraprasthajyoti
- Model
- IND-4C7 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Kick-off in 1 week
- Warranty
- Clarifications to utility at no cost
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale33 kV plantIND-4C7-01 | Network scale: 33 kV plant | 1 report · Kick-off in 1 week | on quote |
| Network scale66 kV systemIND-4C7-02 | Network scale: 66 kV system | 1 report · Kick-off in 1 week | on quote |
| Network scale132 kV systemIND-4C7-03 | Network scale: 132 kV system | 1 report · Kick-off in 1 week | on quote |
Specifications
| Network scale | 33 kV plant to 132 kV system (see variants) |
|---|---|
| Study type | Harmonics |
| Software | DIgSILENT PowerFactorymade to order: ETAP / PSS/E |
| Model data | Client single line diagram and data |
| Deliverables | Study report with results |
| Grid code checks | LVRT/HVRT and ramp rate |
| Review | Utility submission support |
| Scenarios | Multiple dispatch casesmade to order: Normal and N-1 |
| Team | Power system engineermade to order: Lead plus modelling specialist |
| Turnaround | 4-6 weeksmade to order: 2-3 weeks |
| Validation | Compared with measured data |