Catalogue / Power system studies (load flow, short circuit, grid code)
Grid code compliance study, Ultra 6 seriesSample
by Indraprasthajyoti Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Indraprasthajyoti Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Ultra 6 service of grid code compliance study by Indraprasthajyoti covers 6 network scale options (11 kV plant to 400 kV system). Key features: reactive power capability curves, relay setting files ready to load and fault level verification of switchgear. Used by renewable developers seeking connectivity, utilities and consultants and industrial plants adding generation. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation 2-6 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Indraprasthajyoti
- Model
- IND-4C7 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- 2-6 weeks
- Warranty
- Clarifications to utility at no cost
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale11 kV plantIND-4C7-01 | Network scale: 11 kV plant | 1 report · 2-6 weeks | on quote |
| Network scale33 kV plantIND-4C7-02 | Network scale: 33 kV plant | 1 report · 2-6 weeks | on quote |
| Network scale66 kV systemIND-4C7-03 | Network scale: 66 kV system | 1 report · 2-6 weeks | on quote |
| Network scale132 kV systemIND-4C7-04 | Network scale: 132 kV system | 1 report · 2-6 weeks | on quote |
| Network scale220 kV systemIND-4C7-05 | Network scale: 220 kV system | 1 report · 2-6 weeks | on quote |
| Network scale400 kV systemIND-4C7-06 | Network scale: 400 kV system | 1 report · 2-6 weeks | on quote |
Specifications
| Network scale | 11 kV plant to 400 kV system (see variants) |
|---|---|
| Study type | Dynamic and transientmade to order: Load flow and short circuit / Harmonics / Protection coordination |
| Software | ETAPmade to order: PSS/E / DIgSILENT PowerFactory |
| Model data | Client single line diagram and datamade to order: Utility network model |
| Deliverables | Study report with resultsmade to order: Model files and relay settings |
| Grid code checks | LVRT/HVRT and ramp ratemade to order: Voltage and reactive power capability |
| Review | Utility submission supportmade to order: Lender review |
| Scenarios | Multiple dispatch cases |
| Team | Power system engineermade to order: Lead plus modelling specialist |
| Turnaround | 4-6 weeks |
| Validation | Compared with measured datamade to order: Peer review |