Catalogue / Resource assessment (solar, wind, hydro)
Hydro resource and flow duration study, Smart seriesSample
by Indraprasthajyoti Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Indraprasthajyoti Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Indraprasthajyoti Smart hydro resource and flow duration study, offered in 4 measurement duration options from 3 months to 18 months. Key features: loss factors for local conditions, data quality control and filling and turbine and module selection input. Suited to state agencies mapping resource, lenders needing P90 and hybrid project planners. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Campaign 3-24 months; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Indraprasthajyoti
- Model
- IND-C83 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Campaign 3-24 months
- Warranty
- Data availability guarantee above 95%
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement duration3 monthsIND-C83-01 | Measurement duration: 3 months | 1 report · Campaign 3-24 months | on quote |
| Measurement duration6 monthsIND-C83-02 | Measurement duration: 6 months | 1 report · Campaign 3-24 months | on quote |
| Measurement duration12 monthsIND-C83-03 | Measurement duration: 12 months | 1 report · Campaign 3-24 months | on quote |
| Measurement duration18 monthsIND-C83-04 | Measurement duration: 18 months | 1 report · Campaign 3-24 months | on quote |
Specifications
| Measurement duration | 3 months to 18 months (see variants) |
|---|---|
| Technology | Small hydromade to order: Solar GHI/DNI / Wind |
| Data source | Satellite and reanalysismade to order: On-site measurement / Hybrid with MCP |
| Equipment | Class A pyranometer stationmade to order: 80-120 m met mast with LiDAR |
| Uncertainty | P50/P90 with uncertainty budgetmade to order: Bankable assessment |
| Modelling | WAsP, WindPRO |
| Deliverable | Hourly time series datasetmade to order: Resource report |
| Calibration | Traceable calibration |
| Site count | Single sitemade to order: Multi-site comparison |
| Maintenance | Quarterly site visitmade to order: Remote health checks |
| Turnaround | Report in 3 weeksmade to order: Report within 6 weeks of data |