Catalogue / Mobile substations

No photo yet

Trailer-mounted mobile substation, Eco seriesSample

by Jalline Transformer Works (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Jalline Transformer Works (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Trailer-mounted mobile substation from Jalline, Eco series: 4 transformer rating options between 10 MVA and 50 MVA. Design: quick restoration after transformer failure, pre-wired and tested on a trailer and bay-extension and maintenance outage cover. Suited to maintenance outage support, discom emergency backup and mining sites. Designed and tested to IEC 62271-202, IS 2026 and IEC 60076. Lead time 30-40 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Jalline
Model
JAL-032 series
Listing type
Product
Unit
nos
Minimum order
10 nos
Lead time
30-40 weeks
Warranty
24 months
Standards
IEC 62271-202, IS 2026, IEC 60076
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Packaging
Drum / reel with end caps
Delivery terms
Door delivery in metro cities
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Transformer rating10 MVAJAL-032-01Transformer rating: 10 MVA10 nos · 30-40 weeksfor verified buyers
Transformer rating20 MVAJAL-032-02Transformer rating: 20 MVA10 nos · 30-40 weeksfor verified buyers
Transformer rating31.5 MVAJAL-032-03Transformer rating: 31.5 MVA10 nos · 30-40 weeksfor verified buyers
Transformer rating50 MVAJAL-032-04Transformer rating: 50 MVA10 nos · 30-40 weeksfor verified buyers

Specifications

Transformer rating10 MVA to 50 MVA (see variants)
Primary voltage132 kV
Secondary voltage11 kV
ChassisContainer
Primary switchgearGIS baymade to order: AIS disconnector and breaker
Secondary switchgearIndoor VCB panel
Control and relayNumerical relays
Fire protectionDetection and extinguisher
Auxiliary supplyDC battery + DG
Transport weightUp to 45 t
Setup time< 4 hoursmade to order: < 24 hours
GroundingMobile earthing kit
Cable reelIncluded

BARREL: Bharat Atom Renewable Resources Energy Limited