Catalogue / Energy audits

No photo yet

Mandatory energy audit for designated consumers, Pro 3 seriesSample

by Jhelum Corporate Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Jhelum Corporate Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Mandatory energy audit for designated consumers from Jhelum, Pro 3 series: 3 connected load options between 5 MW and 25 MW. Key features: verification after implementation, statutory forms and BEE reporting and savings quantified with measured data. Typically used for commercial buildings, hospitals and hotels and industrial plants. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Audit in 1-2 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Jhelum
Model
JHE-A72 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Savings estimate accuracy within agreed band
Standards
Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
Delivers to
West India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Connected load5 MWJHE-A72-01Connected load: 5 MW1 site · Audit in 1-2 weeksfor verified buyers
Connected load10 MWJHE-A72-02Connected load: 10 MW1 site · Audit in 1-2 weeksfor verified buyers
Connected load25 MWJHE-A72-03Connected load: 25 MW1 site · Audit in 1-2 weeksfor verified buyers

Specifications

Connected load5 MW to 25 MW (see variants)
Audit levelDetailed audit
InstrumentsUltrasonic flow meter, lux metermade to order: Power analyser, thermal camera
AuditorCertified Energy Managermade to order: BEE accredited energy auditor
ReportSavings opportunities with paybackmade to order: Implementation roadmap
BaselineMeasured baselinemade to order: 12-month bills analysis
Measurement duration3 days
CoverageElectricalmade to order: Electrical and thermal / Utilities
StatutoryForm-1 and Form-2 filingmade to order: PAT scheme Form-A
DeliverableReport and presentationmade to order: Report and monitoring plan
Follow-upNot included

BARREL: Bharat Atom Renewable Resources Energy Limited