Catalogue / Ammonia & methanol synthesis equipment
CO2-to-methanol unit, Neo seriesSample
by Jhelumkiran Hydrogen (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Jhelumkiran Hydrogen (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Jhelumkiran Neo CO2-to-methanol unit, offered in 5 production capacity options from 1 TPD to 100 TPD. Highlights: compact skid-mounted layout, remote operation with DCS and leak detection and emergency flare. Suited to marine fuel, chemical industry and fertiliser plants. Designed and tested to ISO 22734, API 650 and ASME B31.3. Lead time 30-40 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Jhelumkiran
- Model
- JHE-422 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 1 lot
- Lead time
- 30-40 weeks
- Warranty
- As per contract
- Standards
- ISO 22734, API 650, ASME B31.3
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- FOR nearest railhead
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Production capacity1 TPDJHE-422-01 | Production capacity: 1 TPD | 1 lot · 30-40 weeks | for verified buyers |
| Production capacity5 TPDJHE-422-02 | Production capacity: 5 TPD | 1 lot · 30-40 weeks | for verified buyers |
| Production capacity20 TPDJHE-422-03 | Production capacity: 20 TPD | 1 lot · 30-40 weeks | for verified buyers |
| Production capacity50 TPDJHE-422-04 | Production capacity: 50 TPD | 1 lot · 50-70 weeks | for verified buyers |
| Production capacity100 TPDJHE-422-05 | Production capacity: 100 TPD | 1 lot · 50-70 weeks | for verified buyers |
Specifications
| Production capacity | 1 TPD to 100 TPD (see variants) |
|---|---|
| Product | Methanol |
| Synthesis pressure | 200 bar |
| Reactor temperature | 400-500 deg C |
| Catalyst | Iron based |
| Feedstock | Hydrogen and captured CO2 |
| N2 source | Cryogenic ASUmade to order: PSA |
| Turndown | 20-100%made to order: 40-100% |
| Specific power | 1.1 MWh per tonne MeOH |
| Product purity | 99.5% NH3 |
| Storage | Atmospheric tank |
| Control | DCSmade to order: PLC |