Catalogue / Hydro turbines (Francis, Kaplan, Pelton)
Turgo turbine, Smart seriesSample
by Jhelumojas Hydro Engineering (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Jhelumojas Hydro Engineering (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Jhelumojas Smart turgo turbine, offered in 5 turbine output options from 3 MW to 50 MW. Key features: wear-resistant coating for Himalayan silt, shop assembly and trial prior to dispatch and cavitation-resistant coatings. Suited to small hydro projects, renovation and modernisation and run-of-river schemes. Designed and tested to IEC 60193, IEC 60041 and IS 12800. Lead time 10-14 months; delivers to South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Jhelumojas
- Model
- JHE-C26 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 10-14 months
- Warranty
- 36 months
- Standards
- IEC 60193, IEC 60041, IS 12800
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- Door delivery in metro cities
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Turbine output3 MWJHE-C26-01 | Turbine output: 3 MW | 1 nos · 10-14 months | for verified buyers |
| Turbine output5 MWJHE-C26-02 | Turbine output: 5 MW | 1 nos · 10-14 months | for verified buyers |
| Turbine output10 MWJHE-C26-03 | Turbine output: 10 MW | 1 nos · 10-14 months | for verified buyers |
| Turbine output25 MWJHE-C26-04 | Turbine output: 25 MW | 1 nos · 14-20 months | for verified buyers |
| Turbine output50 MWJHE-C26-05 | Turbine output: 50 MW | 1 nos · 14-20 months | for verified buyers |
Specifications
| Turbine output | 3 MW to 50 MW (see variants) |
|---|---|
| Turbine type | Bulb |
| Net head | 200-800 mmade to order: 5-30 m / 30-200 m |
| Rated speed | 500 rpm |
| Shaft orientation | Horizontal |
| Runner material | 13Cr-4Ni stainless steel |
| Efficiency at best point | 94% |
| Flow range | 3-100 m3/s |
| Wicket gates | Cast steel with oil-free bushes |
| Runaway speed | 1.8 x ratedmade to order: 2.2 x rated |
| Design life | 40 years |