Catalogue / Grid connectivity & GNA applications
GNA application with CTUIL, Core 7 seriesSample
by Kakatiyaanant Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kakatiyaanant Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
GNA application with CTUIL from Kakatiyaanant, Core 7 series: 4 capacity applied options between 10 MW and 250 MW. Highlights: preparation of mandatory technical details, bank guarantee timeline tracking and eligibility check before filing. Used by industrial captive generators, renewable developers and green hydrogen projects. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kakatiyaanant
- Model
- KAK-B89 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- Rework of deficient applications
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWKAK-B89-01 | Capacity applied: 10 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied50 MWKAK-B89-02 | Capacity applied: 50 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied100 MWKAK-B89-03 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied250 MWKAK-B89-04 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | for verified buyers |
Specifications
| Capacity applied | 10 MW to 250 MW (see variants) |
|---|---|
| Application | GNA |
| Scope | Document preparation and filingmade to order: End-to-end liaison |
| Bank guarantee | Arranged through partner bankmade to order: Arranged by client |
| Studies | Detailed power system study |
| Portal handling | CTUIL portal |
| Team | Dedicated managermade to order: Regulatory lead and engineer |
| Timeline | Approval 3-6 monthsmade to order: Filing in 2 weeks |
| Technical documents | Switchyard layout and GA drawings |
| Queries | Responded within 2 daysmade to order: Until grant |
| Fee basis | Fixed plus successmade to order: Fixed |