Catalogue / Energy audits

No photo yet

Mandatory energy audit for designated consumers, Core seriesSample

by Kakatiya Corporate Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kakatiya Corporate Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Mandatory energy audit for designated consumers from Kakatiya, Core series: 3 connected load options between 1 MW and 10 MW. Key features: payback and ROI ranking, verification after implementation and statutory forms and BEE reporting. Suited to commercial buildings, PAT designated consumers and hospitals and hotels. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Audit in 1-2 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kakatiya
Model
KAK-A74 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Savings estimate accuracy within agreed band
Standards
Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Connected load1 MWKAK-A74-01Connected load: 1 MW1 site · Audit in 1-2 weekson quote
Connected load5 MWKAK-A74-02Connected load: 5 MW1 site · Audit in 1-2 weekson quote
Connected load10 MWKAK-A74-03Connected load: 10 MW1 site · Audit in 1-2 weekson quote

Specifications

Connected load1 MW to 10 MW (see variants)
Audit levelInvestment-grade auditmade to order: Walk-through / Detailed audit
InstrumentsPower analyser, thermal cameramade to order: Ultrasonic flow meter, lux meter
AuditorBEE accredited energy auditor
ReportImplementation roadmapmade to order: Savings opportunities with payback
Baseline12-month bills analysis
Measurement duration7 days
CoverageElectricalmade to order: Electrical and thermal / Utilities
StatutoryForm-1 and Form-2 filing
DeliverableReport and monitoring planmade to order: Report and presentation
Follow-upVerification after implementation

BARREL: Bharat Atom Renewable Resources Energy Limited