Aggregation of industrial loads, Flex seriesSample
by Kakatiya Corporate Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kakatiya Corporate Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Flex service of aggregation of industrial loads by Kakatiya covers 5 curtailable load options (1 MW to 50 MW). Design: support for grid operators, reduced peak demand charges and real-time dashboards. Typically used for cold storage and water pumping, industrial plants with flexible load and commercial buildings. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Enrolment 4-8 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kakatiya
- Model
- KAK-B44 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Enrolment 4-8 weeks
- Warranty
- Performance reporting
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load1 MWKAK-B44-01 | Curtailable load: 1 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load5 MWKAK-B44-02 | Curtailable load: 5 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load10 MWKAK-B44-03 | Curtailable load: 10 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load25 MWKAK-B44-04 | Curtailable load: 25 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load50 MWKAK-B44-05 | Curtailable load: 50 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
Specifications
| Curtailable load | 1 MW to 50 MW (see variants) |
|---|---|
| Programme | Aggregator DR |
| Control | Automated through SCADAmade to order: Manual |
| Notice | 2 hoursmade to order: Day ahead / 15 minutes |
| Duration per event | 4 hoursmade to order: 1 hour |
| Events per year | Unlimited |
| Metering | Existing meter |
| Incentive sharing | 70:30 customer:aggregatormade to order: 80:20 |
| Baseline method | Regression |
| Reporting | Monthly savings |
| Contract term | 3 years |