Catalogue / Demand response

No photo yet

Aggregation of industrial loads, Eco seriesSample

by Kakatiya Corporate Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kakatiya Corporate Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Eco service of aggregation of industrial loads by Kakatiya covers 3 curtailable load options (5 MW to 25 MW). Key features: settlement transparency, reduced peak demand charges and integration with plant process limits. Typically used for DISCOMs needing peak relief, commercial buildings and cold storage and water pumping. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Assessment in 2-3 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kakatiya
Model
KAK-B46 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
Assessment in 2-3 weeks
Warranty
Performance reporting
Standards
CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Curtailable load5 MWKAK-B46-01Curtailable load: 5 MW1 MW · Assessment in 2-3 weeksfor verified buyers
Curtailable load10 MWKAK-B46-02Curtailable load: 10 MW1 MW · Assessment in 2-3 weeksfor verified buyers
Curtailable load25 MWKAK-B46-03Curtailable load: 25 MW1 MW · Assessment in 2-3 weeksfor verified buyers

Specifications

Curtailable load5 MW to 25 MW (see variants)
ProgrammeUtility DRmade to order: Aggregator DR / TOD optimisation
ControlAutomated through SCADA
Notice2 hours
Duration per event4 hours
Events per year20made to order: 50 / Unlimited
MeteringExisting metermade to order: Dedicated interval meter
Incentive sharing70:30 customer:aggregator
Baseline method10-day average
ReportingMonthly savingsmade to order: Event report
Contract term3 years

BARREL: Bharat Atom Renewable Resources Energy Limited