Aggregation of industrial loads, Eco seriesSample
by Kakatiya Corporate Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kakatiya Corporate Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Eco service of aggregation of industrial loads by Kakatiya covers 3 curtailable load options (5 MW to 25 MW). Key features: settlement transparency, reduced peak demand charges and integration with plant process limits. Typically used for DISCOMs needing peak relief, commercial buildings and cold storage and water pumping. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Assessment in 2-3 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kakatiya
- Model
- KAK-B46 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Assessment in 2-3 weeks
- Warranty
- Performance reporting
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load5 MWKAK-B46-01 | Curtailable load: 5 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load10 MWKAK-B46-02 | Curtailable load: 10 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load25 MWKAK-B46-03 | Curtailable load: 25 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
Specifications
| Curtailable load | 5 MW to 25 MW (see variants) |
|---|---|
| Programme | Utility DRmade to order: Aggregator DR / TOD optimisation |
| Control | Automated through SCADA |
| Notice | 2 hours |
| Duration per event | 4 hours |
| Events per year | 20made to order: 50 / Unlimited |
| Metering | Existing metermade to order: Dedicated interval meter |
| Incentive sharing | 70:30 customer:aggregator |
| Baseline method | 10-day average |
| Reporting | Monthly savingsmade to order: Event report |
| Contract term | 3 years |