Catalogue / Energy audits

No photo yet

Mandatory energy audit for designated consumers, Prime 5 seriesSample

by Kakatiya Corporate Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kakatiya Corporate Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Mandatory energy audit for designated consumers from Kakatiya, Prime 5 series: 3 connected load options between 1 MW and 10 MW. Design: solar and efficiency retrofit options, power factor and harmonics assessment and verification after implementation. Used by commercial buildings, hospitals and hotels and PAT designated consumers. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Audit in 1-2 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kakatiya
Model
KAK-A72 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Savings estimate accuracy within agreed band
Standards
Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Connected load1 MWKAK-A72-01Connected load: 1 MW1 site · Audit in 1-2 weeksfor verified buyers
Connected load5 MWKAK-A72-02Connected load: 5 MW1 site · Audit in 1-2 weeksfor verified buyers
Connected load10 MWKAK-A72-03Connected load: 10 MW1 site · Audit in 1-2 weeksfor verified buyers

Specifications

Connected load1 MW to 10 MW (see variants)
Audit levelWalk-throughmade to order: Detailed audit / Investment-grade audit
InstrumentsPower analyser, thermal cameramade to order: Ultrasonic flow meter, lux meter
AuditorCertified Energy Manager
ReportSavings opportunities with paybackmade to order: Implementation roadmap
BaselineMeasured baselinemade to order: 12-month bills analysis
Measurement duration14 daysmade to order: 3 days / 7 days
CoverageElectrical and thermal
StatutoryForm-1 and Form-2 filing
DeliverableReport and monitoring plan
Follow-upNot included

BARREL: Bharat Atom Renewable Resources Energy Limited