Catalogue / Solar module recycling
Module testing for reuse, Ultra 9 seriesSample
by Kakatiya Energy Markets (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kakatiya Energy Markets (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Module testing for reuse from Kakatiya, Ultra 9 series: 3 quantity options between 10 tonnes and 100 tonnes. Design: collection logistics included, reuse screening for good modules and high material recovery rate. Suited to rooftop owners, EPC contractors and solar plant owners with repowering. Delivered in line with E-Waste (Management) Rules 2022, CPCB Guidelines and Hazardous Waste Rules 2016. Mobilisation Pick-up in 7-14 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kakatiya
- Model
- KAK-148 series
- Listing type
- Service
- Unit
- tonne
- Minimum order
- 1 tonne
- Lead time
- Pick-up in 7-14 days
- Warranty
- As per authorisation
- Standards
- E-Waste (Management) Rules 2022, CPCB Guidelines, Hazardous Waste Rules 2016
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Quantity10 tonnesKAK-148-01 | Quantity: 10 tonnes | 1 tonne · Pick-up in 7-14 days | on quote |
| Quantity50 tonnesKAK-148-02 | Quantity: 50 tonnes | 1 tonne · Pick-up in 7-14 days | on quote |
| Quantity100 tonnesKAK-148-03 | Quantity: 100 tonnes | 1 tonne · Pick-up in 7-14 days | on quote |
Specifications
| Quantity | 10 tonnes to 100 tonnes (see variants) |
|---|---|
| Process | Thermal and chemical recoverymade to order: Mechanical separation / Reuse testing |
| Recovery rate | 85% |
| Materials recovered | Glass, aluminium frame, coppermade to order: Silicon, silver |
| Authorisation | Registered recycler |
| Collection | Pick-up arrangedmade to order: Client delivers |
| Certificate | Recycling certificate |
| Data | Traceability recordsmade to order: Weight and material report |
| Turnaround | 2-4 weeks |
| Hazard handling | Lead and cadmium controlsmade to order: Broken-glass safe handling |
| Pricing basis | Net of recovered value |