Catalogue / Electrical safety audits

No photo yet

Safety audit for solar plants and substations, Titan 7 seriesSample

by Kakatiya Logistics (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kakatiya Logistics (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Titan 7 service of safety audit for solar plants and substations by Kakatiya covers 4 installed load options (1 MVA to 25 MVA). Highlights: risk-ranked findings, compliance matrix against CEA safety rules and earthing health and soil resistivity. Suited to hospitals and commercial buildings, solar and wind sites and data centres. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kakatiya
Model
KAK-885 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Clarifications on report at no cost for 6 months
Standards
Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installed load1 MVAKAK-885-01Installed load: 1 MVA1 site · Audit in 1-2 weekson quote
Installed load5 MVAKAK-885-02Installed load: 5 MVA1 site · Audit in 1-2 weekson quote
Installed load10 MVAKAK-885-03Installed load: 10 MVA1 site · Report in 7-14 dayson quote
Installed load25 MVAKAK-885-04Installed load: 25 MVA1 site · Report in 7-14 dayson quote

Specifications

Installed load1 MVA to 25 MVA (see variants)
ScopeVisual and documentation auditmade to order: Audit with measurements / Audit with arc-flash study
AuditorChartered engineer
MeasurementsEarth resistance, insulationmade to order: Thermography and power quality
ReportAction plan with timeline
Statutory recordsRegisters, test certificates, licencemade to order: Permit-to-work audit
Sampling100% of HV equipment
Follow-upClose-out verificationmade to order: Re-audit after 3 months
Turnaround1-2 weeksmade to order: 3-4 weeks
PresentationFindings to management
AccreditationISO/IEC 17020 bodymade to order: Government recognised agency

BARREL: Bharat Atom Renewable Resources Energy Limited