Catalogue / Electrical safety audits
Safety audit for solar plants and substations, Titan 7 seriesSample
by Kakatiya Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kakatiya Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Titan 7 service of safety audit for solar plants and substations by Kakatiya covers 4 installed load options (1 MVA to 25 MVA). Highlights: risk-ranked findings, compliance matrix against CEA safety rules and earthing health and soil resistivity. Suited to hospitals and commercial buildings, solar and wind sites and data centres. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kakatiya
- Model
- KAK-885 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Audit in 1-2 weeks
- Warranty
- Clarifications on report at no cost for 6 months
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load1 MVAKAK-885-01 | Installed load: 1 MVA | 1 site · Audit in 1-2 weeks | on quote |
| Installed load5 MVAKAK-885-02 | Installed load: 5 MVA | 1 site · Audit in 1-2 weeks | on quote |
| Installed load10 MVAKAK-885-03 | Installed load: 10 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load25 MVAKAK-885-04 | Installed load: 25 MVA | 1 site · Report in 7-14 days | on quote |
Specifications
| Installed load | 1 MVA to 25 MVA (see variants) |
|---|---|
| Scope | Visual and documentation auditmade to order: Audit with measurements / Audit with arc-flash study |
| Auditor | Chartered engineer |
| Measurements | Earth resistance, insulationmade to order: Thermography and power quality |
| Report | Action plan with timeline |
| Statutory records | Registers, test certificates, licencemade to order: Permit-to-work audit |
| Sampling | 100% of HV equipment |
| Follow-up | Close-out verificationmade to order: Re-audit after 3 months |
| Turnaround | 1-2 weeksmade to order: 3-4 weeks |
| Presentation | Findings to management |
| Accreditation | ISO/IEC 17020 bodymade to order: Government recognised agency |