Catalogue / Third-party inspection (TPI)
Cable drum inspection and sampling, Smart 8 seriesSample
by Kakatiya Logistics (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kakatiya Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Cable drum inspection and sampling from Kakatiya, Smart 8 series: 5 inspection effort options between 1 man-day and 50 man-days. Key features: non-conformity reports with closure tracking, quick mobilisation across India and hold and witness points per QAP. Typically used for utilities and PSUs, lender quality assurance and EPC contractors and developers. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kakatiya
- Model
- KAK-215 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- Re-inspection at no cost for disputed lots
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort1 man-dayKAK-215-01 | Inspection effort: 1 man-day | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort5 man-daysKAK-215-02 | Inspection effort: 5 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort10 man-daysKAK-215-03 | Inspection effort: 10 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort20 man-daysKAK-215-04 | Inspection effort: 20 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort50 man-daysKAK-215-05 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | for verified buyers |
Specifications
| Inspection effort | 1 man-day to 50 man-days (see variants) |
|---|---|
| Equipment inspected | Cables and conductorsmade to order: Transformers and reactors / Switchgear and relays / PV modules and inverters |
| Inspection stage | Raw material |
| Standards used | Per approved QAPmade to order: Per client specification |
| Inspector qualification | Level II NDT certifiedmade to order: B.E. Electrical with 8 years experience |
| Accreditation | ISO/IEC 17020 bodymade to order: Empanelled inspection agency |
| Report | Inspection release note |
| Coverage | Pan India |
| Sampling | As per IS 2500 |
| Release note | Hard copy plus scanmade to order: Digital signature |
| Travel | Included in ratemade to order: At actuals |