Catalogue / Third-party inspection (TPI)

No photo yet

Cable drum inspection and sampling, Smart 8 seriesSample

by Kakatiya Logistics (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kakatiya Logistics (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Cable drum inspection and sampling from Kakatiya, Smart 8 series: 5 inspection effort options between 1 man-day and 50 man-days. Key features: non-conformity reports with closure tracking, quick mobilisation across India and hold and witness points per QAP. Typically used for utilities and PSUs, lender quality assurance and EPC contractors and developers. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kakatiya
Model
KAK-215 series
Listing type
Service
Unit
day
Minimum order
1 day
Lead time
Inspector assigned in 48 hours
Warranty
Re-inspection at no cost for disputed lots
Standards
ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Inspection effort1 man-dayKAK-215-01Inspection effort: 1 man-day1 day · Inspector assigned in 48 hoursfor verified buyers
Inspection effort5 man-daysKAK-215-02Inspection effort: 5 man-days1 day · Inspector assigned in 48 hoursfor verified buyers
Inspection effort10 man-daysKAK-215-03Inspection effort: 10 man-days1 day · Inspector assigned in 48 hoursfor verified buyers
Inspection effort20 man-daysKAK-215-04Inspection effort: 20 man-days1 day · Report in 24-48 hoursfor verified buyers
Inspection effort50 man-daysKAK-215-05Inspection effort: 50 man-days1 day · Report in 24-48 hoursfor verified buyers

Specifications

Inspection effort1 man-day to 50 man-days (see variants)
Equipment inspectedCables and conductorsmade to order: Transformers and reactors / Switchgear and relays / PV modules and inverters
Inspection stageRaw material
Standards usedPer approved QAPmade to order: Per client specification
Inspector qualificationLevel II NDT certifiedmade to order: B.E. Electrical with 8 years experience
AccreditationISO/IEC 17020 bodymade to order: Empanelled inspection agency
ReportInspection release note
CoveragePan India
SamplingAs per IS 2500
Release noteHard copy plus scanmade to order: Digital signature
TravelIncluded in ratemade to order: At actuals

BARREL: Bharat Atom Renewable Resources Energy Limited