Catalogue / Electrical safety audits
Safety audit for solar plants and substations, Prime seriesSample
by Kakatiya Logistics (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kakatiya Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Kakatiya Prime safety audit for solar plants and substations, offered in 5 installed load options from 1 MVA to 50 MVA. Design: risk-ranked findings, fire exit and detection checks and training recommendations for staff. Suited to manufacturing plants, data centres and hospitals and commercial buildings. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Report in 7-14 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kakatiya
- Model
- KAK-883 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 7-14 days
- Warranty
- Clarifications on report at no cost for 6 months
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load1 MVAKAK-883-01 | Installed load: 1 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load5 MVAKAK-883-02 | Installed load: 5 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load10 MVAKAK-883-03 | Installed load: 10 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load25 MVAKAK-883-04 | Installed load: 25 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load50 MVAKAK-883-05 | Installed load: 50 MVA | 1 site · Report in 7-14 days | for verified buyers |
Specifications
| Installed load | 1 MVA to 50 MVA (see variants) |
|---|---|
| Scope | Visual and documentation auditmade to order: Audit with measurements / Audit with arc-flash study |
| Auditor | Chartered engineer |
| Measurements | Earth resistance, insulation |
| Report | Findings with risk ratingmade to order: Action plan with timeline |
| Statutory records | Registers, test certificates, licencemade to order: Permit-to-work audit |
| Sampling | 100% of HV equipmentmade to order: Representative LV panels |
| Follow-up | Re-audit after 3 months |
| Turnaround | 3-4 weeks |
| Presentation | Report only |
| Accreditation | Government recognised agencymade to order: ISO/IEC 17020 body |