Catalogue / Power system studies (load flow, short circuit, grid code)

No photo yet

Load flow and short-circuit study, Neo seriesSample

by Kakatiyaojas Logistics (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kakatiyaojas Logistics (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Kakatiyaojas Neo load flow and short-circuit study, offered in 4 network scale options from 33 kV plant to 220 kV system. Key features: PSS/E and PSCAD model support, fault level verification of switchgear and reports for GNA/connectivity application. Suited to utilities and consultants, industrial plants adding generation and renewable developers seeking connectivity. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation 2-6 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kakatiyaojas
Model
KAK-464 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
2-6 weeks
Warranty
Revision for utility comments
Standards
CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Network scale33 kV plantKAK-464-01Network scale: 33 kV plant1 report · 2-6 weekson quote
Network scale66 kV systemKAK-464-02Network scale: 66 kV system1 report · 2-6 weekson quote
Network scale132 kV systemKAK-464-03Network scale: 132 kV system1 report · 2-6 weekson quote
Network scale220 kV systemKAK-464-04Network scale: 220 kV system1 report · 2-6 weekson quote

Specifications

Network scale33 kV plant to 220 kV system (see variants)
Study typeDynamic and transient
SoftwareETAPmade to order: PSS/E / DIgSILENT PowerFactory
Model dataClient single line diagram and data
DeliverablesModel files and relay settings
Grid code checksVoltage and reactive power capability
ReviewUtility submission support
ScenariosMultiple dispatch cases
TeamPower system engineermade to order: Lead plus modelling specialist
Turnaround4-6 weeksmade to order: 2-3 weeks
ValidationCompared with measured datamade to order: Peer review

BARREL: Bharat Atom Renewable Resources Energy Limited