Catalogue / Resource assessment (solar, wind, hydro)

No photo yet

Energy yield assessment P50 and P90, Core 7 seriesSample

by Kakatiyaojas Logistics (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kakatiyaojas Logistics (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Energy yield assessment P50 and P90 from Kakatiyaojas, Core 7 series: 4 measurement duration options between Desktop study and 12 months. Highlights: long-term correction using reference data, extreme wind and wake studies and loss factors for local conditions. Suited to state agencies mapping resource, hybrid project planners and lenders needing P90. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Campaign 3-24 months; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kakatiyaojas
Model
KAK-EB8 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
Campaign 3-24 months
Warranty
As per contract
Standards
IEC 61400-12-1, IEC 61724-1, IEC 61400-15
Delivers to
All India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Measurement durationDesktop studyKAK-EB8-01Measurement duration: Desktop study1 report · Campaign 3-24 monthsfor verified buyers
Measurement duration3 monthsKAK-EB8-02Measurement duration: 3 months1 report · Campaign 3-24 monthsfor verified buyers
Measurement duration6 monthsKAK-EB8-03Measurement duration: 6 months1 report · Campaign 3-24 monthsfor verified buyers
Measurement duration12 monthsKAK-EB8-04Measurement duration: 12 months1 report · Campaign 3-24 monthsfor verified buyers

Specifications

Measurement durationDesktop study to 12 months (see variants)
TechnologyWind
Data sourceSatellite and reanalysismade to order: On-site measurement / Hybrid with MCP
EquipmentClass A pyranometer stationmade to order: 80-120 m met mast with LiDAR
UncertaintyBankable assessment
ModellingPVsyst, SAM
DeliverableResource reportmade to order: Hourly time series dataset
CalibrationTraceable calibrationmade to order: Calibration pre and post campaign
Site countMulti-site comparison
MaintenanceQuarterly site visitmade to order: Remote health checks
TurnaroundReport in 3 weeksmade to order: Report within 6 weeks of data

BARREL: Bharat Atom Renewable Resources Energy Limited