Catalogue / Resource assessment (solar, wind, hydro)
Energy yield assessment P50 and P90, Core 7 seriesSample
by Kakatiyaojas Logistics (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kakatiyaojas Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Energy yield assessment P50 and P90 from Kakatiyaojas, Core 7 series: 4 measurement duration options between Desktop study and 12 months. Highlights: long-term correction using reference data, extreme wind and wake studies and loss factors for local conditions. Suited to state agencies mapping resource, hybrid project planners and lenders needing P90. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Campaign 3-24 months; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kakatiyaojas
- Model
- KAK-EB8 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Campaign 3-24 months
- Warranty
- As per contract
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement durationDesktop studyKAK-EB8-01 | Measurement duration: Desktop study | 1 report · Campaign 3-24 months | for verified buyers |
| Measurement duration3 monthsKAK-EB8-02 | Measurement duration: 3 months | 1 report · Campaign 3-24 months | for verified buyers |
| Measurement duration6 monthsKAK-EB8-03 | Measurement duration: 6 months | 1 report · Campaign 3-24 months | for verified buyers |
| Measurement duration12 monthsKAK-EB8-04 | Measurement duration: 12 months | 1 report · Campaign 3-24 months | for verified buyers |
Specifications
| Measurement duration | Desktop study to 12 months (see variants) |
|---|---|
| Technology | Wind |
| Data source | Satellite and reanalysismade to order: On-site measurement / Hybrid with MCP |
| Equipment | Class A pyranometer stationmade to order: 80-120 m met mast with LiDAR |
| Uncertainty | Bankable assessment |
| Modelling | PVsyst, SAM |
| Deliverable | Resource reportmade to order: Hourly time series dataset |
| Calibration | Traceable calibrationmade to order: Calibration pre and post campaign |
| Site count | Multi-site comparison |
| Maintenance | Quarterly site visitmade to order: Remote health checks |
| Turnaround | Report in 3 weeksmade to order: Report within 6 weeks of data |