Catalogue / Civil & foundation works

No photo yet

Wind turbine foundation construction, Plus seriesSample

by Kakatiyasetu Projects (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kakatiyasetu Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Plus service of wind turbine foundation construction by Kakatiyasetu covers 5 works volume options (1 MW equivalent to 50 MW equivalent). Design: cube and pile test records, pile layout tolerance maintained to design and waterproofing for cable trenches. Used by industrial plants, substations and control rooms and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kakatiyasetu
Model
KAK-258 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
Mobilisation in 10 days
Warranty
Structural defect liability 24 months
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume1 MW equivalentKAK-258-01Works volume: 1 MW equivalent1 job · Mobilisation in 10 daysfor verified buyers
Works volume5 MW equivalentKAK-258-02Works volume: 5 MW equivalent1 job · Mobilisation in 10 daysfor verified buyers
Works volume10 MW equivalentKAK-258-03Works volume: 10 MW equivalent1 job · Mobilisation in 10 daysfor verified buyers
Works volume25 MW equivalentKAK-258-04Works volume: 25 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume50 MW equivalentKAK-258-05Works volume: 50 MW equivalent1 job · 4-12 weeks executionfor verified buyers

Specifications

Works volume1 MW equivalent to 50 MW equivalent (see variants)
Foundation typeDriven steel pilemade to order: Ramming or screw pile / RCC bored pile / Raft or isolated footing
Concrete gradeM30
Pull-out testingRandom test plus lateral loadmade to order: 2% piles tested
ReinforcementFe 500D TMTmade to order: Fe 550D
Roads and drainageNot included
BoundaryCompound wall with barbed wire
QualityCube test reports per pour
MachineryPiling rigs and excavators
Duration3-6 months
Payment termsItem rate with retention

BARREL: Bharat Atom Renewable Resources Energy Limited