Catalogue / Civil & foundation works
Wind turbine foundation construction, Plus seriesSample
by Kakatiyasetu Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kakatiyasetu Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Plus service of wind turbine foundation construction by Kakatiyasetu covers 5 works volume options (1 MW equivalent to 50 MW equivalent). Design: cube and pile test records, pile layout tolerance maintained to design and waterproofing for cable trenches. Used by industrial plants, substations and control rooms and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kakatiyasetu
- Model
- KAK-258 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 10 days
- Warranty
- Structural defect liability 24 months
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume1 MW equivalentKAK-258-01 | Works volume: 1 MW equivalent | 1 job · Mobilisation in 10 days | for verified buyers |
| Works volume5 MW equivalentKAK-258-02 | Works volume: 5 MW equivalent | 1 job · Mobilisation in 10 days | for verified buyers |
| Works volume10 MW equivalentKAK-258-03 | Works volume: 10 MW equivalent | 1 job · Mobilisation in 10 days | for verified buyers |
| Works volume25 MW equivalentKAK-258-04 | Works volume: 25 MW equivalent | 1 job · 4-12 weeks execution | for verified buyers |
| Works volume50 MW equivalentKAK-258-05 | Works volume: 50 MW equivalent | 1 job · 4-12 weeks execution | for verified buyers |
Specifications
| Works volume | 1 MW equivalent to 50 MW equivalent (see variants) |
|---|---|
| Foundation type | Driven steel pilemade to order: Ramming or screw pile / RCC bored pile / Raft or isolated footing |
| Concrete grade | M30 |
| Pull-out testing | Random test plus lateral loadmade to order: 2% piles tested |
| Reinforcement | Fe 500D TMTmade to order: Fe 550D |
| Roads and drainage | Not included |
| Boundary | Compound wall with barbed wire |
| Quality | Cube test reports per pour |
| Machinery | Piling rigs and excavators |
| Duration | 3-6 months |
| Payment terms | Item rate with retention |