Catalogue / Engineering & design

No photo yet

Detailed engineering for solar PV plants, Eco seriesSample

by Kakatiyasetu Projects (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kakatiyasetu Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Detailed engineering for solar PV plants from Kakatiyasetu, Eco series: 4 plant capacity options between 10 MW and 100 MW. Key features: as-built drawing update after commissioning, yield and loss modelling aligned to bankable reports and cable sizing and voltage drop calculations. Used by captive and C&I solar owners, lender technical reviews and EPC contractors bidding for projects. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation 3-4 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kakatiyasetu
Model
KAK-771 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
3-4 weeks
Warranty
Design correction at no cost for 12 months
Standards
CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity10 MWKAK-771-01Plant capacity: 10 MW1 job · 3-4 weeksfor verified buyers
Plant capacity25 MWKAK-771-02Plant capacity: 25 MW1 job · 3-4 weeksfor verified buyers
Plant capacity50 MWKAK-771-03Plant capacity: 50 MW1 job · 6-10 weeksfor verified buyers
Plant capacity100 MWKAK-771-04Plant capacity: 100 MW1 job · 6-10 weeksfor verified buyers

Specifications

Plant capacity10 MW to 100 MW (see variants)
DeliverablesGA drawings, SLD, BoQmade to order: Full IFC drawing set with calculations / Design basis report plus drawings
Design softwarePVsyst, AutoCAD, ETAP
TeamElectrical, civil and SCADA discipline leads
Turnaround3-4 weeks
Revisions included3 roundsmade to order: 2 rounds / Unlimited until approval
Authority submission supportDISCOM/STU drawing approval
Earthing and LA studyOptional add-onmade to order: Included
FormatPDF, CAD and BIM modelmade to order: PDF and native CAD
Site visitTwo visits included
Payment milestones30% advance, 40% on drafts, 30% on IFCmade to order: 50% advance, 50% on delivery

BARREL: Bharat Atom Renewable Resources Energy Limited