Catalogue / Testing & commissioning

No photo yet

SCADA integration and communication testing, Core 8 seriesSample

by Kakatiyasetu Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kakatiyasetu Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Core 8 service of SCADA integration and communication testing by Kakatiyasetu covers 4 plant capacity options (10 MW to 100 MW). Design: test formats agreed before mobilisation, commissioning certificates for lenders and thermography of terminations before charging. Typically used for repowering projects, lender completion tests and EPC handover to owners. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Mobilisation in 5 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kakatiyasetu
Model
KAK-EE2 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
Mobilisation in 5 days
Warranty
Retest at no cost if failure traced to test error
Standards
IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity10 MWKAK-EE2-01Plant capacity: 10 MW1 MW · Mobilisation in 5 dayson quote
Plant capacity25 MWKAK-EE2-02Plant capacity: 25 MW1 MW · Mobilisation in 5 dayson quote
Plant capacity50 MWKAK-EE2-03Plant capacity: 50 MW1 MW · Report in 7 dayson quote
Plant capacity100 MWKAK-EE2-04Plant capacity: 100 MW1 MW · Report in 7 dayson quote

Specifications

Plant capacity10 MW to 100 MW (see variants)
Tests coveredFull plant functional and PR testmade to order: String IV curve, insulation, earth / Transformer, switchgear, relay tests
InstrumentsCalibrated IV tracer, megger, CRM
CalibrationCalibration valid at test datemade to order: NABL traceable certificates
TeamCommissioning engineer plus 2 testersmade to order: Lead plus 5 member crew
Statutory supportDISCOM charging support
ReportsCommissioning dossier with as-builtmade to order: Test reports with signed formats
Duration on site3-4 weeksmade to order: 5-7 days / 10-14 days
Performance guarantee test72-hour trial runmade to order: Capacity and PR test per contract
Grid code checksNot includedmade to order: Reactive power and ramp rate
PaymentMilestone on energisation

BARREL: Bharat Atom Renewable Resources Energy Limited