Module mounting structure and PV module installation, Prime 4 seriesSample

by Kakatiyasetu Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kakatiyasetu Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Prime 4 service of module mounting structure and PV module installation by Kakatiyasetu covers 4 installation scope options (1 MW to 25 MW). Design: cable route marking and tray fixing, material reconciliation reports and module handling to avoid micro-cracks. Suited to utility solar parks, wind farm substations and c&I rooftop and ground mount. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Phased by block; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kakatiyasetu
Model
KAK-727 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
Phased by block
Warranty
Workmanship 12 months
Standards
IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installation scope1 MWKAK-727-01Installation scope: 1 MW1 MW · Phased by blockon quote
Installation scope5 MWKAK-727-02Installation scope: 5 MW1 MW · Phased by blockon quote
Installation scope10 MWKAK-727-03Installation scope: 10 MW1 MW · Phased by blockon quote
Installation scope25 MWKAK-727-04Installation scope: 25 MW1 MW · Phased by blockon quote

Specifications

Installation scope1 MW to 25 MW (see variants)
ScopeStructure and module installation
Manpower deployedPeak crew of 200made to order: 25 technicians per MW-block / 60 technicians plus supervisors
SupervisionSite engineer and safety officer
EquipmentPile driver, crane, telehandlermade to order: Own cranes and erection tools
Quality planClient-approved ITP
SafetyDaily toolbox talks, PPE, permitsmade to order: Lost-time-injury-free target, HIRA
LicenceClass A contractor registration
InsuranceCAR and workmen compensation
ReportingDaily progress reportmade to order: Weekly report with look-ahead plan
Payment termsMilestone based with 10% retention