Catalogue / Mobile substations

No photo yet

Mobile GIS substation, Titan seriesSample

by Kakatiya Transformer Works (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kakatiya Transformer Works (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Kakatiya Titan mobile GIS substation, offered in 4 transformer rating options from 10 MVA to 50 MVA. Highlights: pre-wired and tested on a trailer, quick restoration after transformer failure and bay-extension and maintenance outage cover. Suited to maintenance outage support, discom emergency backup and temporary construction power. Designed and tested to IEC 62271-202, IS 2026 and IEC 60076. Lead time 16-24 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kakatiya
Model
KAK-7D4 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
16-24 weeks
Warranty
36 months
Standards
IEC 62271-202, IS 2026, IEC 60076
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
FOR nearest railhead
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Transformer rating10 MVAKAK-7D4-01Transformer rating: 10 MVA1 nos · 16-24 weeksfor verified buyers
Transformer rating20 MVAKAK-7D4-02Transformer rating: 20 MVA1 nos · 16-24 weeksfor verified buyers
Transformer rating31.5 MVAKAK-7D4-03Transformer rating: 31.5 MVA1 nos · 30-40 weeksfor verified buyers
Transformer rating50 MVAKAK-7D4-04Transformer rating: 50 MVA1 nos · 30-40 weeksfor verified buyers

Specifications

Transformer rating10 MVA to 50 MVA (see variants)
Primary voltage132 kV
Secondary voltage33 kVmade to order: 11 kV
ChassisSkid
Primary switchgearAIS disconnector and breakermade to order: GIS bay
Secondary switchgearIndoor VCB panel
Control and relayNumerical relays
Fire protectionDetection and extinguisher
Auxiliary supplyDC battery + DG
Transport weightUp to 45 t
Setup time< 4 hours
GroundingMobile earthing kit
Cable reelIncluded

BARREL: Bharat Atom Renewable Resources Energy Limited