Catalogue / Module cleaning systems
Sprinkler-based panel washing system, Plus seriesSample
by Kalingagaruda Solar Energy (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kalingagaruda Solar Energy (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Sprinkler-based panel washing system from Kalingagaruda, Plus series: 6 plant capacity covered options between 500 kWp and 100 MWp. Key features: self-charging from onboard small PV, programmable cleaning schedule and operates on tilts up to 35 degrees. Used by utility solar farms, o&M contractors and desert and dusty region solar plants. Designed and tested to IEC 61215, IS 16221 and IEC 62109-1. Lead time 4-6 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kalingagaruda
- Model
- KAL-9B8 series
- Listing type
- Product
- Unit
- set
- Minimum order
- 1 set
- Lead time
- 4-6 weeks
- Warranty
- 12 months from commissioning
- Standards
- IEC 61215, IS 16221, IEC 62109-1
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- Door delivery in metro cities
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity covered500 kWpKAL-9B8-01 | Plant capacity covered: 500 kWp | 1 set · 4-6 weeks | for verified buyers |
| Plant capacity covered1 MWpKAL-9B8-02 | Plant capacity covered: 1 MWp | 1 set · 4-6 weeks | for verified buyers |
| Plant capacity covered5 MWpKAL-9B8-03 | Plant capacity covered: 5 MWp | 1 set · 4-6 weeks | for verified buyers |
| Plant capacity covered10 MWpKAL-9B8-04 | Plant capacity covered: 10 MWp | 1 set · 4-6 weeks | for verified buyers |
| Plant capacity covered50 MWpKAL-9B8-05 | Plant capacity covered: 50 MWp | 1 set · 4-6 weeks | for verified buyers |
| Plant capacity covered100 MWpKAL-9B8-06 | Plant capacity covered: 100 MWp | 1 set · 4-6 weeks | for verified buyers |
Specifications
| Plant capacity covered | 500 kWp to 100 MWp (see variants) |
|---|---|
| Cleaning method | Dry microfibre |
| Drive | Diesel tractor |
| Row length handled | Up to 40 mmade to order: Up to 100 m / Up to 150 m |
| Cleaning speed | 10 m/min |
| Water use | 1.5 l/kWpmade to order: Nil / 0.5 l/kWp |
| Control | Scheduled automaticmade to order: Remote / Manual |
| Brush material | Nylon microfibre |
| Power source | 415 V ACmade to order: Solar-charged battery / 24 V DC |
| Ingress protection | IP65made to order: IP55 |
| Coverage per day | 200 kWp |