Peak load management and curtailment, Edge 8 seriesSample
by Kamrupagni Capital Advisors (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kamrupagni Capital Advisors (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Kamrupagni Edge 8 peak load management and curtailment, offered in 4 curtailable load options from 5 MW to 50 MW. Design: revenue for flexible loads, real-time dashboards and integration with plant process limits. Suited to industrial plants with flexible load, DISCOMs needing peak relief and commercial buildings. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Enrolment 4-8 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kamrupagni
- Model
- KAM-ED3 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Enrolment 4-8 weeks
- Warranty
- As per programme terms
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load5 MWKAM-ED3-01 | Curtailable load: 5 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load10 MWKAM-ED3-02 | Curtailable load: 10 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load25 MWKAM-ED3-03 | Curtailable load: 25 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load50 MWKAM-ED3-04 | Curtailable load: 50 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
Specifications
| Curtailable load | 5 MW to 50 MW (see variants) |
|---|---|
| Programme | Aggregator DRmade to order: Utility DR / TOD optimisation |
| Control | Manualmade to order: Automated through SCADA |
| Notice | Day aheadmade to order: 2 hours / 15 minutes |
| Duration per event | 1 hourmade to order: 4 hours |
| Events per year | 20made to order: 50 / Unlimited |
| Metering | Existing meter |
| Incentive sharing | 80:20 |
| Baseline method | Regressionmade to order: 10-day average |
| Reporting | Event report |
| Contract term | 3 years |