Building energy audit, Ultra 4 seriesSample
by Kamrupagni Capital Advisors (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kamrupagni Capital Advisors (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Ultra 4 service of building energy audit by Kamrupagni covers 6 connected load options (500 kW to 50 MW). Key features: statutory forms and BEE reporting, solar and efficiency retrofit options and payback and ROI ranking. Suited to industrial plants, hospitals and hotels and commercial buildings. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kamrupagni
- Model
- KAM-D79 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 2-4 weeks
- Warranty
- Clarifications for 6 months
- Standards
- Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Connected load500 kWKAM-D79-01 | Connected load: 500 kW | 1 site · Report in 2-4 weeks | on quote |
| Connected load1 MWKAM-D79-02 | Connected load: 1 MW | 1 site · Report in 2-4 weeks | on quote |
| Connected load5 MWKAM-D79-03 | Connected load: 5 MW | 1 site · Report in 2-4 weeks | on quote |
| Connected load10 MWKAM-D79-04 | Connected load: 10 MW | 1 site · Report in 2-4 weeks | on quote |
| Connected load25 MWKAM-D79-05 | Connected load: 25 MW | 1 site · Report in 2-4 weeks | on quote |
| Connected load50 MWKAM-D79-06 | Connected load: 50 MW | 1 site · Report in 2-4 weeks | on quote |
Specifications
| Connected load | 500 kW to 50 MW (see variants) |
|---|---|
| Audit level | Detailed audit |
| Instruments | Ultrasonic flow meter, lux metermade to order: Power analyser, thermal camera |
| Auditor | Certified Energy Manager |
| Report | Savings opportunities with payback |
| Baseline | Measured baseline |
| Measurement duration | 7 daysmade to order: 3 days / 14 days |
| Coverage | Electrical and thermalmade to order: Electrical / Utilities |
| Statutory | PAT scheme Form-Amade to order: Form-1 and Form-2 filing |
| Deliverable | Report and monitoring plan |
| Follow-up | Verification after implementation |