Peak load management and curtailment, Pro seriesSample
by Kamrupagni Capital Advisors (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kamrupagni Capital Advisors (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Peak load management and curtailment from Kamrupagni, Pro series: 4 curtailable load options between 0.5 MW and 10 MW. Highlights: reduced peak demand charges, revenue for flexible loads and integration with plant process limits. Typically used for cold storage and water pumping, commercial buildings and DISCOMs needing peak relief. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Enrolment 4-8 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kamrupagni
- Model
- KAM-ED7 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Enrolment 4-8 weeks
- Warranty
- Performance reporting
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load0.5 MWKAM-ED7-01 | Curtailable load: 0.5 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load1 MWKAM-ED7-02 | Curtailable load: 1 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load5 MWKAM-ED7-03 | Curtailable load: 5 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load10 MWKAM-ED7-04 | Curtailable load: 10 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
Specifications
| Curtailable load | 0.5 MW to 10 MW (see variants) |
|---|---|
| Programme | TOD optimisationmade to order: Utility DR / Aggregator DR |
| Control | Manualmade to order: Automated through SCADA |
| Notice | Day ahead |
| Duration per event | 1 hour |
| Events per year | Unlimited |
| Metering | Existing metermade to order: Dedicated interval meter |
| Incentive sharing | 70:30 customer:aggregatormade to order: 80:20 |
| Baseline method | 10-day averagemade to order: Regression |
| Reporting | Event report |
| Contract term | 1 yearmade to order: 3 years |