Detailed energy audit for industrial plants, Smart 7 seriesSample
by Kamrup Energy Markets (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kamrup Energy Markets (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Detailed energy audit for industrial plants from Kamrup, Smart 7 series: 3 connected load options between 100 kW and 1 MW. Key features: payback and ROI ranking, statutory forms and BEE reporting and verification after implementation. Used by industrial plants, hospitals and hotels and commercial buildings. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kamrup
- Model
- KAM-516 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 2-4 weeks
- Warranty
- Clarifications for 6 months
- Standards
- Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Connected load100 kWKAM-516-01 | Connected load: 100 kW | 1 site · Report in 2-4 weeks | on quote |
| Connected load500 kWKAM-516-02 | Connected load: 500 kW | 1 site · Report in 2-4 weeks | on quote |
| Connected load1 MWKAM-516-03 | Connected load: 1 MW | 1 site · Report in 2-4 weeks | on quote |
Specifications
| Connected load | 100 kW to 1 MW (see variants) |
|---|---|
| Audit level | Detailed audit |
| Instruments | Power analyser, thermal cameramade to order: Ultrasonic flow meter, lux meter |
| Auditor | Certified Energy Manager |
| Report | Implementation roadmap |
| Baseline | Measured baselinemade to order: 12-month bills analysis |
| Measurement duration | 3 daysmade to order: 7 days / 14 days |
| Coverage | Electricalmade to order: Electrical and thermal / Utilities |
| Statutory | PAT scheme Form-Amade to order: Form-1 and Form-2 filing |
| Deliverable | Report and presentationmade to order: Report and monitoring plan |
| Follow-up | Not includedmade to order: Verification after implementation |