Detailed energy audit for industrial plants, Neo seriesSample

by Kamrup Energy Markets (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kamrup Energy Markets (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Kamrup Neo detailed energy audit for industrial plants, offered in 3 connected load options from 1 MW to 10 MW. Design: solar and efficiency retrofit options, savings quantified with measured data and verification after implementation. Typically used for PAT designated consumers, commercial buildings and hospitals and hotels. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kamrup
Model
KAM-516 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Report in 2-4 weeks
Warranty
Clarifications for 6 months
Standards
Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Connected load1 MWKAM-516-01Connected load: 1 MW1 site · Report in 2-4 weeksfor verified buyers
Connected load5 MWKAM-516-02Connected load: 5 MW1 site · Report in 2-4 weeksfor verified buyers
Connected load10 MWKAM-516-03Connected load: 10 MW1 site · Report in 2-4 weeksfor verified buyers

Specifications

Connected load1 MW to 10 MW (see variants)
Audit levelDetailed auditmade to order: Walk-through / Investment-grade audit
InstrumentsPower analyser, thermal camera
AuditorBEE accredited energy auditor
ReportSavings opportunities with paybackmade to order: Implementation roadmap
BaselineMeasured baselinemade to order: 12-month bills analysis
Measurement duration3 daysmade to order: 7 days / 14 days
CoverageElectricalmade to order: Electrical and thermal / Utilities
StatutoryPAT scheme Form-A
DeliverableReport and monitoring plan
Follow-upNot includedmade to order: Verification after implementation

BARREL: Bharat Atom Renewable Resources Energy Limited