Detailed energy audit for industrial plants, Neo seriesSample
by Kamrup Energy Markets (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kamrup Energy Markets (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Kamrup Neo detailed energy audit for industrial plants, offered in 3 connected load options from 1 MW to 10 MW. Design: solar and efficiency retrofit options, savings quantified with measured data and verification after implementation. Typically used for PAT designated consumers, commercial buildings and hospitals and hotels. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kamrup
- Model
- KAM-516 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 2-4 weeks
- Warranty
- Clarifications for 6 months
- Standards
- Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Connected load1 MWKAM-516-01 | Connected load: 1 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load5 MWKAM-516-02 | Connected load: 5 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load10 MWKAM-516-03 | Connected load: 10 MW | 1 site · Report in 2-4 weeks | for verified buyers |
Specifications
| Connected load | 1 MW to 10 MW (see variants) |
|---|---|
| Audit level | Detailed auditmade to order: Walk-through / Investment-grade audit |
| Instruments | Power analyser, thermal camera |
| Auditor | BEE accredited energy auditor |
| Report | Savings opportunities with paybackmade to order: Implementation roadmap |
| Baseline | Measured baselinemade to order: 12-month bills analysis |
| Measurement duration | 3 daysmade to order: 7 days / 14 days |
| Coverage | Electricalmade to order: Electrical and thermal / Utilities |
| Statutory | PAT scheme Form-A |
| Deliverable | Report and monitoring plan |
| Follow-up | Not includedmade to order: Verification after implementation |