Catalogue / Panel wiring & assembly
Marshalling kiosk wiring, Duo 3 seriesSample
by Kamrupnandi Engineering Works (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kamrupnandi Engineering Works (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Marshalling kiosk wiring from Kamrupnandi, Duo 3 series: 6 panel complexity options between Up to 50 wires and Over 2000 wires. Key features: ferrule numbering and colour code, continuity and insulation tests and dressed cabling with duct. Used by solar and wind projects, industrial automation and switchgear manufacturers. Delivered in line with IEC 61439-1, IS 8623 and IS 13947. Mobilisation 3-5 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kamrupnandi
- Model
- KAM-0A2 series
- Listing type
- Service
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 3-5 weeks
- Warranty
- Rework of wiring defects
- Standards
- IEC 61439-1, IS 8623, IS 13947
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Panel complexityUp to 50 wiresKAM-0A2-01 | Panel complexity: Up to 50 wires | 1 nos · 3-5 weeks | on quote |
| Panel complexityUp to 200 wiresKAM-0A2-02 | Panel complexity: Up to 200 wires | 1 nos · 3-5 weeks | on quote |
| Panel complexityUp to 500 wiresKAM-0A2-03 | Panel complexity: Up to 500 wires | 1 nos · 3-5 weeks | on quote |
| Panel complexityUp to 1000 wiresKAM-0A2-04 | Panel complexity: Up to 1000 wires | 1 nos · 3-5 weeks | on quote |
| Panel complexityUp to 2000 wiresKAM-0A2-05 | Panel complexity: Up to 2000 wires | 1 nos · 3-5 weeks | on quote |
| Panel complexityOver 2000 wiresKAM-0A2-06 | Panel complexity: Over 2000 wires | 1 nos · 3-5 weeks | on quote |
Specifications
| Panel complexity | Up to 50 wires to Over 2000 wires (see variants) |
|---|---|
| Panel type | LT distributionmade to order: Control panel / MCC / Relay panel |
| Wiring standard | IS 8623made to order: IEC 61439 |
| Wire type | Multi-coremade to order: FRLS 1.5 sq mm / FRLS 2.5 sq mm |
| Ferrules | Printed with numberingmade to order: Hand marked |
| Testing | Continuitymade to order: Insulation / Functional test |
| Components | Customer supplied |
| Documents | Test reportmade to order: As-built drawing |
| Enclosure | Assemblermade to order: Customer |
| Marking | Engraved labels |
| Inspection | Third party optional |