Catalogue / Cabling, trenching & HDD works

No photo yet

Underground cable route survey, Eco seriesSample

by Kamrup Projects (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kamrup Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Underground cable route survey from Kamrup, Eco series: 5 cable route length options between 2 km and 50 km. Highlights: dewatering in high water table, utility locating before excavation and warning tape and marker installation. Suited to railway and highway crossings, renewable plant internal networks and urban distribution upgrades. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Permits may extend timeline; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kamrup
Model
KAM-3B6 series
Listing type
Service
Unit
km
Minimum order
1 km
Lead time
Permits may extend timeline
Warranty
Restoration warranty 6 months
Standards
IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Cable route length2 kmKAM-3B6-01Cable route length: 2 km1 km · Permits may extend timelinefor verified buyers
Cable route length5 kmKAM-3B6-02Cable route length: 5 km1 km · Permits may extend timelinefor verified buyers
Cable route length10 kmKAM-3B6-03Cable route length: 10 km1 km · Permits may extend timelinefor verified buyers
Cable route length20 kmKAM-3B6-04Cable route length: 20 km1 km · Permits may extend timelinefor verified buyers
Cable route length50 kmKAM-3B6-05Cable route length: 50 km1 km · Permits may extend timelinefor verified buyers

Specifications

Cable route length2 km to 50 km (see variants)
MethodTrenchless HDDmade to order: Open trench / Trench plus HDD for crossings
HDD capacityUp to 450 mm bore
Trench depth1.2 mmade to order: 0.9 m / 1.5 m
Cable type11/33 kV XLPE
JointingCold shrinkmade to order: Heat shrink / Premoulded
RestorationRoad and footpath restorationmade to order: Backfill and compaction only
PermissionsClient arranges
TestingInsulation and VLF test
Productivity50 m per day HDD
CrewTrenching team of 15

BARREL: Bharat Atom Renewable Resources Energy Limited