Catalogue / Engineering & design
Balance-of-plant electrical design, Pro 8 seriesSample
by Kamrup Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kamrup Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Kamrup Pro 8 balance-of-plant electrical design, offered in 6 plant capacity options from 1 MW to 100 MW. Key features: yield and loss modelling aligned to bankable reports, as-built drawing update after commissioning and compliant with state grid code requirements. Typically used for IPPs and developers, EPC contractors bidding for projects and lender technical reviews. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation Mobilisation in 7 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kamrup
- Model
- KAM-CE1 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 7 days
- Warranty
- As per contract
- Standards
- CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity1 MWKAM-CE1-01 | Plant capacity: 1 MW | 1 job · Mobilisation in 7 days | for verified buyers |
| Plant capacity5 MWKAM-CE1-02 | Plant capacity: 5 MW | 1 job · Mobilisation in 7 days | for verified buyers |
| Plant capacity10 MWKAM-CE1-03 | Plant capacity: 10 MW | 1 job · Mobilisation in 7 days | for verified buyers |
| Plant capacity25 MWKAM-CE1-04 | Plant capacity: 25 MW | 1 job · Mobilisation in 7 days | for verified buyers |
| Plant capacity50 MWKAM-CE1-05 | Plant capacity: 50 MW | 1 job · 6-10 weeks | for verified buyers |
| Plant capacity100 MWKAM-CE1-06 | Plant capacity: 100 MW | 1 job · 6-10 weeks | for verified buyers |
Specifications
| Plant capacity | 1 MW to 100 MW (see variants) |
|---|---|
| Deliverables | Full IFC drawing set with calculationsmade to order: GA drawings, SLD, BoQ / Design basis report plus drawings |
| Design software | PVsyst, STAAD, ETAP, Civil 3D |
| Team | Lead engineer plus 3 designersmade to order: Electrical, civil and SCADA discipline leads |
| Turnaround | 6-8 weeks |
| Revisions included | 2 roundsmade to order: 3 rounds / Unlimited until approval |
| Authority submission support | DISCOM/STU drawing approvalmade to order: CEA/CEIG drawing approval / None |
| Earthing and LA study | Optional add-on |
| Format | PDF and native CADmade to order: PDF, CAD and BIM model |
| Site visit | Desk design only |
| Payment milestones | 50% advance, 50% on delivery |