Catalogue / Civil & foundation works
Control room and substation building construction, Neo seriesSample
by Kamrup Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kamrup Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Neo service of control room and substation building construction by Kamrup covers 4 works volume options (1 MW equivalent to 25 MW equivalent). Key features: local labour employed where possible, waterproofing for cable trenches and monsoon-ready drainage planning. Typically used for wind farms, substations and control rooms and solar parks. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kamrup
- Model
- KAM-3B8 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 10 days
- Warranty
- Pile load test certified
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume1 MW equivalentKAM-3B8-01 | Works volume: 1 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume5 MW equivalentKAM-3B8-02 | Works volume: 5 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume10 MW equivalentKAM-3B8-03 | Works volume: 10 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume25 MW equivalentKAM-3B8-04 | Works volume: 25 MW equivalent | 1 job · 4-12 weeks execution | on quote |
Specifications
| Works volume | 1 MW equivalent to 25 MW equivalent (see variants) |
|---|---|
| Foundation type | Ramming or screw pile |
| Concrete grade | M40 for turbine foundation |
| Pull-out testing | 2% piles tested |
| Reinforcement | Fe 550Dmade to order: Fe 500D TMT |
| Roads and drainage | Not includedmade to order: Murram road, 4 m wide / WBM road with culverts |
| Boundary | Chain link fence 2.4 mmade to order: Compound wall with barbed wire |
| Quality | NABL lab testing of materialsmade to order: Cube test reports per pour |
| Machinery | Batching plant at site |
| Duration | 3-6 monthsmade to order: 4-8 weeks |
| Payment terms | Item rate with retentionmade to order: Measured running bills |