Catalogue / Solar & wind BoP construction
Control room and SCADA works, Pro 2 seriesSample
by Kamrup Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kamrup Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Kamrup Pro 2 control room and SCADA works, offered in 3 project size options from 5 MW to 25 MW. Design: material reconciliation weekly, compliance with site safety plan and trench depth and sand bedding as per standard. Suited to wind-solar hybrid parks, IPPs managing multiple packages and EPC contractors subcontracting BoP. Delivered in line with IS 7098 (XLPE Cables), IEC 62548 and IS 3043 (Earthing). Mobilisation 3-9 months execution; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kamrup
- Model
- KAM-9E8 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- 3-9 months execution
- Warranty
- Workmanship 12 months
- Standards
- IS 7098 (XLPE Cables), IEC 62548, IS 3043 (Earthing)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Project size5 MWKAM-9E8-01 | Project size: 5 MW | 1 MW · 3-9 months execution | on quote |
| Project size10 MWKAM-9E8-02 | Project size: 10 MW | 1 MW · 3-9 months execution | on quote |
| Project size25 MWKAM-9E8-03 | Project size: 25 MW | 1 MW · 3-9 months execution | on quote |
Specifications
| Project size | 5 MW to 25 MW (see variants) |
|---|---|
| Scope | Cabling and earthingmade to order: Civil plus electrical BoP / Complete BoP except modules |
| DC cables | 4 sq mm solar cablemade to order: 6 sq mm solar cable |
| MV cables | 33 kV XLPE Cu |
| Inverter station | Skid or containerised |
| Lightning protection | Franklin rod with mastmade to order: ESE system |
| Crew size | 150 personsmade to order: 80 persons / 300 persons |
| Equipment | Own fleet |
| Quality | QAP with stage inspectionmade to order: Megger and continuity records |
| Duration | 3-5 months |
| Payment | Monthly measured billsmade to order: Milestone based |