Catalogue / Third-party inspection (TPI)
Civil and structural stage inspection, Volt seriesSample
by Kamrup Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kamrup Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Civil and structural stage inspection from Kamrup, Volt series: 6 inspection effort options between 1 man-day and 100 man-days. Key features: non-conformity reports with closure tracking, quick mobilisation across India and photographic evidence of each inspection. Typically used for lender quality assurance, utilities and PSUs and government procurement. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kamrup
- Model
- KAM-966 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort1 man-dayKAM-966-01 | Inspection effort: 1 man-day | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort5 man-daysKAM-966-02 | Inspection effort: 5 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort10 man-daysKAM-966-03 | Inspection effort: 10 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort20 man-daysKAM-966-04 | Inspection effort: 20 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort50 man-daysKAM-966-05 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort100 man-daysKAM-966-06 | Inspection effort: 100 man-days | 1 day · Report in 24-48 hours | on quote |
Specifications
| Inspection effort | 1 man-day to 100 man-days (see variants) |
|---|---|
| Equipment inspected | Towers and structures |
| Inspection stage | Final pre-dispatch |
| Standards used | Per approved QAP |
| Inspector qualification | Level II NDT certifiedmade to order: B.E. Electrical with 8 years experience |
| Accreditation | Empanelled inspection agency |
| Report | Inspection release note |
| Coverage | Domestic and export vendors |
| Sampling | AQL level II |
| Release note | Digital signaturemade to order: Hard copy plus scan |
| Travel | Included in ratemade to order: At actuals |