Catalogue / Electrical safety audits
Earthing and lightning protection audit, Plus seriesSample
by Kamrup Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kamrup Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Plus service of earthing and lightning protection audit by Kamrup covers 5 installed load options (500 kVA to 25 MVA). Highlights: training recommendations for staff, fire exit and detection checks and compliance matrix against CEA safety rules. Typically used for manufacturing plants, hospitals and commercial buildings and data centres. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kamrup
- Model
- KAM-5F3 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Audit in 1-2 weeks
- Warranty
- Clarifications on report at no cost for 6 months
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load500 kVAKAM-5F3-01 | Installed load: 500 kVA | 1 site · Audit in 1-2 weeks | on quote |
| Installed load1 MVAKAM-5F3-02 | Installed load: 1 MVA | 1 site · Audit in 1-2 weeks | on quote |
| Installed load5 MVAKAM-5F3-03 | Installed load: 5 MVA | 1 site · Audit in 1-2 weeks | on quote |
| Installed load10 MVAKAM-5F3-04 | Installed load: 10 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load25 MVAKAM-5F3-05 | Installed load: 25 MVA | 1 site · Report in 7-14 days | on quote |
Specifications
| Installed load | 500 kVA to 25 MVA (see variants) |
|---|---|
| Scope | Audit with arc-flash study |
| Auditor | Chartered engineermade to order: CEA-licensed engineer |
| Measurements | Earth resistance, insulationmade to order: Thermography and power quality |
| Report | Action plan with timelinemade to order: Findings with risk rating |
| Statutory records | Registers, test certificates, licence |
| Sampling | 100% of HV equipment |
| Follow-up | Re-audit after 3 monthsmade to order: Close-out verification |
| Turnaround | 1-2 weeks |
| Presentation | Findings to management |
| Accreditation | Government recognised agencymade to order: ISO/IEC 17020 body |