Catalogue / Electrical safety audits

No photo yet

Earthing and lightning protection audit, Neo 6 seriesSample

by Kamrup Projects (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kamrup Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Neo 6 service of earthing and lightning protection audit by Kamrup covers 3 installed load options (1 MVA to 10 MVA). Design: fire exit and detection checks, compliance matrix against CEA safety rules and photographic evidence of non-compliances. Used by manufacturing plants, hospitals and commercial buildings and data centres. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Report in 7-14 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kamrup
Model
KAM-5F3 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Report in 7-14 days
Warranty
Re-audit at reduced rate
Standards
Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installed load1 MVAKAM-5F3-01Installed load: 1 MVA1 site · Report in 7-14 daysfor verified buyers
Installed load5 MVAKAM-5F3-02Installed load: 5 MVA1 site · Report in 7-14 daysfor verified buyers
Installed load10 MVAKAM-5F3-03Installed load: 10 MVA1 site · Report in 7-14 daysfor verified buyers

Specifications

Installed load1 MVA to 10 MVA (see variants)
ScopeVisual and documentation audit
AuditorChartered engineermade to order: CEA-licensed engineer
MeasurementsEarth resistance, insulationmade to order: Thermography and power quality
ReportAction plan with timelinemade to order: Findings with risk rating
Statutory recordsPermit-to-work audit
SamplingRepresentative LV panels
Follow-upClose-out verificationmade to order: Re-audit after 3 months
Turnaround3-4 weeks
PresentationFindings to management
AccreditationISO/IEC 17020 body

BARREL: Bharat Atom Renewable Resources Energy Limited