Catalogue / Electrical safety audits
Earthing and lightning protection audit, Neo 6 seriesSample
by Kamrup Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kamrup Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Neo 6 service of earthing and lightning protection audit by Kamrup covers 3 installed load options (1 MVA to 10 MVA). Design: fire exit and detection checks, compliance matrix against CEA safety rules and photographic evidence of non-compliances. Used by manufacturing plants, hospitals and commercial buildings and data centres. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Report in 7-14 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kamrup
- Model
- KAM-5F3 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 7-14 days
- Warranty
- Re-audit at reduced rate
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load1 MVAKAM-5F3-01 | Installed load: 1 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load5 MVAKAM-5F3-02 | Installed load: 5 MVA | 1 site · Report in 7-14 days | for verified buyers |
| Installed load10 MVAKAM-5F3-03 | Installed load: 10 MVA | 1 site · Report in 7-14 days | for verified buyers |
Specifications
| Installed load | 1 MVA to 10 MVA (see variants) |
|---|---|
| Scope | Visual and documentation audit |
| Auditor | Chartered engineermade to order: CEA-licensed engineer |
| Measurements | Earth resistance, insulationmade to order: Thermography and power quality |
| Report | Action plan with timelinemade to order: Findings with risk rating |
| Statutory records | Permit-to-work audit |
| Sampling | Representative LV panels |
| Follow-up | Close-out verificationmade to order: Re-audit after 3 months |
| Turnaround | 3-4 weeks |
| Presentation | Findings to management |
| Accreditation | ISO/IEC 17020 body |