Catalogue / Hybrid & dead-tank switchgear

No photo yet

Disconnecting circuit breaker, Neo seriesSample

by Kanchi HV Switchgear (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kanchi HV Switchgear (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Neo range of disconnecting circuit breaker by Kanchi covers 3 system voltage options (145 kV to 420 kV). Highlights: combines breaker, disconnector and CT, fewer SF6 joints and reduced foundation and civil work. Typically used for renewable pooling stations, compact substations and brownfield bay additions. Designed and tested to IEC 62271-100, IEC 62271-108 and IEC 62271-1. Lead time 28-36 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kanchi
Model
KAN-073 series
Listing type
Product
Unit
nos
Minimum order
5 nos
Lead time
28-36 weeks
Warranty
36 months
Standards
IEC 62271-100, IEC 62271-108, IEC 62271-1
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Steel skid with shrink wrap
Delivery terms
FOR nearest railhead
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
System voltage145 kVKAN-073-01System voltage: 145 kV5 nos · 28-36 weeksfor verified buyers
System voltage245 kVKAN-073-02System voltage: 245 kV5 nos · 28-36 weeksfor verified buyers
System voltage420 kVKAN-073-03System voltage: 420 kV5 nos · 28-36 weeksfor verified buyers

Specifications

System voltage145 kV to 420 kV (see variants)
ConceptDead tank
Rated current2000 Amade to order: 3150 A / 4000 A
Breaking current31.5 kAmade to order: 40 kA / 50 kA
GasSF6
Integrated CTYes, up to 5 cores
Integrated disconnectorYes
Integrated earth switchYes
MechanismSpring
InsulationAir outdoor bushings
Footprint saving50-70%
Operating temp-30 to 50 deg C
MonitoringGas density, operation counter

BARREL: Bharat Atom Renewable Resources Energy Limited