Catalogue / Ammonia & methanol synthesis equipment
Modular green ammonia plant, Neo 2 seriesSample
by Kavachcore New Energy (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kavachcore New Energy (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Neo 2 range of modular green ammonia plant by Kavachcore covers 3 production capacity options (50 TPD to 300 TPD). Highlights: catalyst performance guarantee, flexible operation with variable renewable input and heat recovery to steam generation. Used by power-to-X pilots, fertiliser plants and marine fuel. Designed and tested to ISO 22734, API 650 and ASME B31.3. Lead time 50-70 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kavachcore
- Model
- KAV-8F3 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 1 lot
- Lead time
- 50-70 weeks
- Warranty
- 24 months from commissioning
- Standards
- ISO 22734, API 650, ASME B31.3
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- Door delivery in metro cities
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Production capacity50 TPDKAV-8F3-01 | Production capacity: 50 TPD | 1 lot · 50-70 weeks | on quote |
| Production capacity100 TPDKAV-8F3-02 | Production capacity: 100 TPD | 1 lot · 50-70 weeks | on quote |
| Production capacity300 TPDKAV-8F3-03 | Production capacity: 300 TPD | 1 lot · 50-70 weeks | on quote |
Specifications
| Production capacity | 50 TPD to 300 TPD (see variants) |
|---|---|
| Product | Ammoniamade to order: Methanol |
| Synthesis pressure | 200 bar |
| Reactor temperature | 220-260 deg C |
| Catalyst | Ruthenium based |
| Feedstock | Hydrogen and captured CO2made to order: Green hydrogen and nitrogen |
| N2 source | Cryogenic ASU |
| Turndown | 40-100%made to order: 20-100% |
| Specific power | 1.1 MWh per tonne MeOH |
| Product purity | 99.5% NH3made to order: Grade AA methanol |
| Storage | Refrigerated tank |
| Control | PLC |