Catalogue / Furnace & rectifier transformers

No photo yet

Induction furnace transformer, Pro 8 seriesSample

by Kaverianant Power Transformers (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kaverianant Power Transformers (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Kaverianant Pro 8 induction furnace transformer, offered in 6 rating options from 2 MVA to 60 MVA. Design: low stray flux heating, withstands frequent short-circuit duty and optional built-in series reactor. Used by chlor-alkali, ferro-alloy plants and aluminium smelters. Designed and tested to IS 2026, IEC 60076 and IEC 61378-1. Lead time 16-20 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kaverianant
Model
KAV-646 series
Listing type
Product
Unit
nos
Minimum order
10 nos
Lead time
16-20 weeks
Warranty
36 months from supply
Standards
IS 2026, IEC 60076, IEC 61378-1
Delivers to
West India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Packaging
Wooden crate, seaworthy
Delivery terms
FOR site, freight included
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rating2 MVAKAV-646-01Rating: 2 MVA10 nos · 16-20 weekson quote
Rating5 MVAKAV-646-02Rating: 5 MVA10 nos · 16-20 weekson quote
Rating10 MVAKAV-646-03Rating: 10 MVA10 nos · 16-20 weekson quote
Rating20 MVAKAV-646-04Rating: 20 MVA10 nos · 16-20 weekson quote
Rating40 MVAKAV-646-05Rating: 40 MVA10 nos · 28-36 weekson quote
Rating60 MVAKAV-646-06Rating: 60 MVA10 nos · 28-36 weekson quote

Specifications

Rating2 MVA to 60 MVA (see variants)
Primary voltage33 kV
Secondary voltageUp to 1000 V
ApplicationLRF
CoolingOFWF
Tap changerOff-circuitmade to order: OLTC
Secondary tapsUp to 21 steps
Vector groupDy11
Overload20% for 2 hours
Impedance8%made to order: 6%
ReactorExternal
BushingsHigh-current plate type
MonitoringOnline DGA optional

BARREL: Bharat Atom Renewable Resources Energy Limited