Catalogue / Site acceptance & pre-commissioning tests

No photo yet

Cable and insulation resistance testing, Prime 9 seriesSample

by Kaveridhruv Consultants (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kaveridhruv Consultants (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Cable and insulation resistance testing from Kaveridhruv, Prime 9 series: 5 plant size options between 1 MW and 50 MW. Design: defect register shared daily, checklist driven testing and instrument calibration certificates. Suited to EPC handover, lender completion and renewable parks. Delivered in line with IEC 62446-1, IS 3043 and IEC 61557. Mobilisation Mobilisation in 3-7 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kaveridhruv
Model
KAV-C65 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Mobilisation in 3-7 days
Warranty
Report accuracy guaranteed
Standards
IEC 62446-1, IS 3043, IEC 61557
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant size1 MWKAV-C65-01Plant size: 1 MW1 site · Mobilisation in 3-7 daysfor verified buyers
Plant size5 MWKAV-C65-02Plant size: 5 MW1 site · Mobilisation in 3-7 daysfor verified buyers
Plant size10 MWKAV-C65-03Plant size: 10 MW1 site · Mobilisation in 3-7 daysfor verified buyers
Plant size25 MWKAV-C65-04Plant size: 25 MW1 site · On-site 3-21 daysfor verified buyers
Plant size50 MWKAV-C65-05Plant size: 50 MW1 site · On-site 3-21 daysfor verified buyers

Specifications

Plant size1 MW to 50 MW (see variants)
ScopeComplete SAT with performance testmade to order: Electrical pre-commissioning / Solar SAT
InstrumentsRelay test set, IV tracer, CRM
Test sequencePer client approved formatmade to order: Visual, mechanical, electrical
TeamTest engineer plus 2 technicians
Duration on site3-5 daysmade to order: 10 days / 3 weeks
ReportsTest results on approved formatsmade to order: Digital dossier with photos
CalibrationNABL traceable
Witnessed byClient engineermade to order: Lender engineer or authority
Retest policyChargedmade to order: One retest included
PaymentOn completion of reportmade to order: 50% advance

BARREL: Bharat Atom Renewable Resources Energy Limited