Catalogue / Third-party inspection (TPI)
Pre-dispatch inspection of transformers and switchgear, Core seriesSample
by Kaveridhruv Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kaveridhruv Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Kaveridhruv Core pre-dispatch inspection of transformers and switchgear, offered in 3 inspection effort options from 10 man-days to 50 man-days. Design: calibration check of test equipment, photographic evidence of each inspection and hold and witness points per QAP. Used by EPC contractors and developers, utilities and PSUs and lender quality assurance. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kaveridhruv
- Model
- KAV-093 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- Re-inspection at no cost for disputed lots
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort10 man-daysKAV-093-01 | Inspection effort: 10 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort20 man-daysKAV-093-02 | Inspection effort: 20 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort50 man-daysKAV-093-03 | Inspection effort: 50 man-days | 1 day · Inspector assigned in 48 hours | on quote |
Specifications
| Inspection effort | 10 man-days to 50 man-days (see variants) |
|---|---|
| Equipment inspected | PV modules and inverters |
| Inspection stage | In-processmade to order: Raw material / Final pre-dispatch |
| Standards used | Per client specification |
| Inspector qualification | Level II NDT certifiedmade to order: B.E. Electrical with 8 years experience |
| Accreditation | ISO/IEC 17020 bodymade to order: Empanelled inspection agency |
| Report | Detailed report with photos in 48 hoursmade to order: Inspection release note |
| Coverage | Pan India |
| Sampling | AQL level IImade to order: As per IS 2500 |
| Release note | Hard copy plus scanmade to order: Digital signature |
| Travel | Included in rate |