Catalogue / Third-party inspection (TPI)
Pre-dispatch inspection of transformers and switchgear, Smart seriesSample
by Kaveridhruv Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kaveridhruv Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Smart service of pre-dispatch inspection of transformers and switchgear by Kaveridhruv covers 4 inspection effort options (5 man-days to 50 man-days). Key features: calibration check of test equipment, quick mobilisation across India and independent opinion for buyers. Typically used for government procurement, EPC contractors and developers and utilities and PSUs. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kaveridhruv
- Model
- KAV-092 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- Re-inspection at no cost for disputed lots
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort5 man-daysKAV-092-01 | Inspection effort: 5 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort10 man-daysKAV-092-02 | Inspection effort: 10 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort20 man-daysKAV-092-03 | Inspection effort: 20 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort50 man-daysKAV-092-04 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | on quote |
Specifications
| Inspection effort | 5 man-days to 50 man-days (see variants) |
|---|---|
| Equipment inspected | PV modules and inverters |
| Inspection stage | Final pre-dispatch |
| Standards used | Per client specificationmade to order: Per approved QAP |
| Inspector qualification | B.E. Electrical with 8 years experiencemade to order: Level II NDT certified |
| Accreditation | ISO/IEC 17020 body |
| Report | Detailed report with photos in 48 hoursmade to order: Inspection release note |
| Coverage | Pan India |
| Sampling | As per IS 2500 |
| Release note | Hard copy plus scan |
| Travel | At actualsmade to order: Included in rate |