Catalogue / Solar plant O&M & module cleaning
Inverter and SCADA maintenance, Plus seriesSample
by Kaveriohm Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kaveriohm Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Inverter and SCADA maintenance from Kaveriohm, Plus series: 4 plant capacity options between 1 MWp and 25 MWp. Highlights: compliance with grid code scheduling, inventory and spares ledger and thermography twice a year. Suited to IPP solar parks, lender-monitored assets and c&I rooftop owners. Delivered in line with IEC 61724-1, IEC 62446-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Takeover in 2-3 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kaveriohm
- Model
- KAV-622 series
- Listing type
- Service
- Unit
- MWp
- Minimum order
- 1 MWp
- Lead time
- Takeover in 2-3 weeks
- Warranty
- Availability guarantee with penalty
- Standards
- IEC 61724-1, IEC 62446-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity1 MWpKAV-622-01 | Plant capacity: 1 MWp | 1 MWp · Takeover in 2-3 weeks | on quote |
| Plant capacity5 MWpKAV-622-02 | Plant capacity: 5 MWp | 1 MWp · Takeover in 2-3 weeks | on quote |
| Plant capacity10 MWpKAV-622-03 | Plant capacity: 10 MWp | 1 MWp · Baseline audit before takeover | on quote |
| Plant capacity25 MWpKAV-622-04 | Plant capacity: 25 MWp | 1 MWp · Baseline audit before takeover | on quote |
Specifications
| Plant capacity | 1 MWp to 25 MWp (see variants) |
|---|---|
| Scope | Full O&M with spare managementmade to order: Cleaning and routine checks / O&M plus asset management |
| Cleaning method | Semi-automatic wet |
| Cleaning frequency | Monthly in monsoon |
| Availability guarantee | Grid availability 99.5%made to order: Plant availability 99% |
| Manpower | Plant manager plus 15 staff for 100 MWmade to order: 1 engineer plus 4 technicians per 10 MW |
| Spares | Consumables included |
| Monitoring | Weekly PR and PLF report |
| Response time | 24 hoursmade to order: 4 hours for critical faults |
| Reporting | Monthly generation reportmade to order: Dashboard access for lenders |
| Contract term | 3 yearsmade to order: 1 year / 5 years |