Catalogue / Live-line & hot-line washing
Hot-line maintenance on energised lines, Neo seriesSample
by Kaverispark Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kaverispark Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Neo service of hot-line maintenance on energised lines by Kaverispark covers 4 voltage level options (66 kV to 400 kV). Design: weather window planning, leakage current monitoring and utility permit coordination. Suited to utility transmission networks, coastal and industrial pollution zones and renewable evacuation lines. Delivered in line with IEC 60815, CEA (Measures relating to Safety) Regulations and IEEE 957. Mobilisation Permit based scheduling; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kaverispark
- Model
- KAV-E79 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Permit based scheduling
- Warranty
- As per contract
- Standards
- IEC 60815, CEA (Measures relating to Safety) Regulations, IEEE 957
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Voltage level66 kVKAV-E79-01 | Voltage level: 66 kV | 1 job · Permit based scheduling | on quote |
| Voltage level132 kVKAV-E79-02 | Voltage level: 132 kV | 1 job · Permit based scheduling | on quote |
| Voltage level220 kVKAV-E79-03 | Voltage level: 220 kV | 1 job · Permit based scheduling | on quote |
| Voltage level400 kVKAV-E79-04 | Voltage level: 400 kV | 1 job · Permit based scheduling | on quote |
Specifications
| Voltage level | 66 kV to 400 kV (see variants) |
|---|---|
| Method | Robotic cleaningmade to order: Pressurised water jet / Dry ice blasting / Drone washing |
| Resistivity of water | Demineralised watermade to order: Above 5000 ohm-cm |
| Scope | Per km of line |
| Frequency | Pre-monsoon |
| Crew | Linemen with insulated platformmade to order: Team of 5 with live-line operator |
| Tools | Insulated hot sticks, bucket truck |
| Safety | Shutdown not required |
| Outputs | Photo log of insulators |
| Productivity | 100 insulators per day |
| Licence | Trained under utility protocols |