Catalogue / Third-party inspection (TPI)
Cable drum inspection and sampling, Ultra seriesSample
by Kaverispark Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kaverispark Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Cable drum inspection and sampling from Kaverispark, Ultra series: 6 inspection effort options between 1 man-day and 100 man-days. Key features: calibration check of test equipment, hold and witness points per QAP and quick mobilisation across India. Typically used for government procurement, utilities and PSUs and lender quality assurance. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kaverispark
- Model
- KAV-216 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort1 man-dayKAV-216-01 | Inspection effort: 1 man-day | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort5 man-daysKAV-216-02 | Inspection effort: 5 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort10 man-daysKAV-216-03 | Inspection effort: 10 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort20 man-daysKAV-216-04 | Inspection effort: 20 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort50 man-daysKAV-216-05 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort100 man-daysKAV-216-06 | Inspection effort: 100 man-days | 1 day · Report in 24-48 hours | on quote |
Specifications
| Inspection effort | 1 man-day to 100 man-days (see variants) |
|---|---|
| Equipment inspected | Towers and structures |
| Inspection stage | Final pre-dispatchmade to order: Raw material / In-process |
| Standards used | Per client specificationmade to order: Per approved QAP |
| Inspector qualification | B.E. Electrical with 8 years experiencemade to order: Level II NDT certified |
| Accreditation | ISO/IEC 17020 body |
| Report | Detailed report with photos in 48 hours |
| Coverage | Pan India |
| Sampling | AQL level IImade to order: As per IS 2500 |
| Release note | Hard copy plus scan |
| Travel | At actualsmade to order: Included in rate |