Catalogue / Substation & line O&M
Power transformer routine checks, Xtra seriesSample
by Kaverispark Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kaverispark Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Kaverispark Xtra power transformer routine checks, offered in 5 voltage level options from 33 kV to 400 kV. Design: licensed supervisory staff, permit-to-work and lockout-tagout and insulator and joint inspection. Typically used for industrial captive substations, railway and metro sub-stations and state utility outsourcing. Delivered in line with CEA (Measures relating to Safety) Regulations, CEA (Grid Standards) Regulations and IS 10028 (Transformer Installation). Mobilisation Mobilisation in 2-3 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kaverispark
- Model
- KAV-059 series
- Listing type
- Service
- Unit
- month
- Minimum order
- 1 month
- Lead time
- Mobilisation in 2-3 weeks
- Warranty
- Service credits for avoidable outages
- Standards
- CEA (Measures relating to Safety) Regulations, CEA (Grid Standards) Regulations, IS 10028 (Transformer Installation)
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Voltage level33 kVKAV-059-01 | Voltage level: 33 kV | 1 month · Mobilisation in 2-3 weeks | on quote |
| Voltage level66 kVKAV-059-02 | Voltage level: 66 kV | 1 month · Mobilisation in 2-3 weeks | on quote |
| Voltage level132 kVKAV-059-03 | Voltage level: 132 kV | 1 month · Mobilisation in 2-3 weeks | on quote |
| Voltage level220 kVKAV-059-04 | Voltage level: 220 kV | 1 month · Baseline condition audit first | on quote |
| Voltage level400 kVKAV-059-05 | Voltage level: 400 kV | 1 month · Baseline condition audit first | on quote |
Specifications
| Voltage level | 33 kV to 400 kV (see variants) |
|---|---|
| Scope | Maintenance onlymade to order: Operation and maintenance / Operation, maintenance and statutory compliance |
| Shift pattern | General shift plus on-callmade to order: 3 shifts, 24x7 |
| Manpower | Engineer plus 6 operatorsmade to order: Two engineers plus 12 staff |
| Line patrolling | Monthly foot patrol |
| Testing | Annual relay and CT/PT test |
| Statutory records | Log books, permits, shutdown registermade to order: CEIG renewal support |
| Spares | Critical spares by owner |
| Response time | 2 hours for tripmade to order: 4 hours |
| Reporting | Monthly fault and maintenance reportmade to order: Real-time dashboards |
| Term | 1 yearmade to order: 3 years |